SQO-OSS meeting 2007-04-18

From Istlab
Revision as of 18:49, 18 April 2007 by Dimitro (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Some random notes I 've kept and also some things that I 've though of while writing:

  • We should work in 2 week iterations, after which we are going to integrate and sync our work
  • We will use UMLGraph for classes and possibly for activity/sequence diagrams
  • Metrics that do not output a single value but things such as diagrams or plots are going to be stored on the hard disk and a the file path will be stored in their value field.
  • We will need a lightweight job submission/work queue implementation, ie an asynchronous work model will be used
  • The presentation layer will use web services as a mechanism to retrieve results.
    • What about job submission? Should we only use local (ie cmd-line) job submission?
    • What about security and authentication?
  • What are the requirements for data sources such as mailing lists and bug management databases?

Work on D5

The work on D5 will be carried out in a distributed manner. Each person that has been assigned a piece of D5 is responsible for all phases of designing, from implementing prototypes to asking and managing partners' contribution. Panos will have the final word in all cases.

  • Sections in D5 and work assignments
    • Plugin description and infrastructure, sync with equinox (bkarak)
    • Database access and DB schema (panos)
    • Presentation layer (gousiosg)
    • Access to version control systems (and possibly other data sources) (circular)
  • dmitro will work on finding references and information on OSGi and giving a presentation to all of us