SQO-OSS meeting 2007-04-18

From Istlab
Revision as of 16:42, 18 April 2007 by 195.251.249.155 (talk) (Initial content)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Some random notes I 've kept:

  • We should work in 2 week iterations, after which we are going to integrate and sync our work
  • We will use UMLGraph for classes and possibly for activity/sequence diagrams
  • Metrics that do not output a single value but things such as diagrams or plots are going to be stored on the hard disk and a the file path will be stored in their value field.
  • We will need a lightweight job submission/work queue implementation, ie an asynchronous work model will be used
  • The presentation layer will use web services as a mechanism to retrieve results.
    • What about job submission? Should we only use local (ie cmd-line) job submission only?
    • What about security and authentication?

Work on D5

  • Sections in D5 and work assignments
    • Plugin description and infrastructure, sync with equinox (vbill)
    • Database access