Kostas Stroggylos PhD research plan: Difference between revisions

From Istlab
Jump to navigationJump to search
Content deleted Content added
Circular (talk | contribs)
No edit summary
Circular (talk | contribs)
No edit summary
Line 8: Line 8:


More detailed plan to follow.
More detailed plan to follow.

[[Category:SENSE]]

Revision as of 00:47, 11 June 2008

Following the research proposal, the research plan outline is as follows:

  • Aug 08: Complete the UmlDiff implementation (JDevAn port/optimization) for refactoring detection
  • Sep 08: Perform tests with the search-based and the UmlDiff-based method for detecting refactorings
  • Dec 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
  • Feb 09: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
  • Apr 09: Start writing final thesis

More detailed plan to follow.