Kostas Stroggylos PhD research plan: Difference between revisions

From Istlab
Jump to navigationJump to search
Content deleted Content added
No edit summary
 
Circular (talk | contribs)
No edit summary
Line 1: Line 1:
Following the research proposal, the research plan outline is as follows:
Following the research proposal, the research plan outline is as follows:


* Sep 07: Build a data / metric infrastructure (first version: May 07), probably publish something based on that experience
* Mar 08: Complete the data / metric collection infrastructure, probably publish something based on that experience
* Jun 08: Perform tests with the search-based and the JDevan port for detecting refactorings
* Mar 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
* Sep 07: Perform comparative analysis of OSS and commercial software projects regarding software quality and process metrics, report results
* Sep 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
* Mar 08: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
* Dec 08: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
* Sep 08: Start writing final thesis
* Mar 09: Start writing final thesis


More detailed plan to follow.
More detailed plan to follow.

Revision as of 13:55, 15 January 2008

Following the research proposal, the research plan outline is as follows:

  • Mar 08: Complete the data / metric collection infrastructure, probably publish something based on that experience
  • Jun 08: Perform tests with the search-based and the JDevan port for detecting refactorings
  • Sep 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
  • Dec 08: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
  • Mar 09: Start writing final thesis

More detailed plan to follow.