Giorgos Gousios publication plan: Difference between revisions

From Istlab
Jump to navigationJump to search
Content deleted Content added
Gousiosg (talk | contribs)
mNo edit summary
Remove infrastructure publication - obsolete
Line 6: Line 6:
**Where: ? (OSS08 maybe)
**Where: ? (OSS08 maybe)
**When work should start: 07/2007 (after D5 is finished)
**When work should start: 07/2007 (after D5 is finished)

*The $0 RTD infrastructure
**Describing the continuous integration and project management/monitoring infrastructure for SQO-OSS
**With: ade, dds
**Where: ACM Queue?
**When work should start: 10/2007 (after D4 is finished)


*Assessing OS overhead in various JVMs
*Assessing OS overhead in various JVMs

Revision as of 14:52, 2 July 2007

Ideas

  • An architecture for integrating software quality assessment tools
    • Describing the SQO-OSS architecture
    • With: louridas, dds, ?
    • Where: ? (OSS08 maybe)
    • When work should start: 07/2007 (after D5 is finished)
  • Assessing OS overhead in various JVMs
    • Using Dtrace (hopefully ported to OSX by then), assess the overhead of the OS on various JVMs
    • Where: Next SANE
    • When work should start: When the SANE CfP is out
  • Workload suitability for CMT processors
    • Benchmark various workloads on Niagara and assess its suitability for each workload type
    • With: mgogoulos, dds
    • Where: If good result then Usenix else Sane
    • When work should start: 09/2007
  • The Gusix (subject to change :-)) operating system
    • Describing the system I am building for my PhD
    • With: dds
    • Where: Usenix Conference
    • When work should start: 11/2007

Under development

  • Experiences porting JikesRVM to Xen, Some Usenix workshop (OSDI08 or VEE08)
  • Java's pound of flesh (With dds)

Pending

To appear