Stephanos Androutsellis PhD research plan: Difference between revisions

From Istlab
Jump to navigationJump to search
Content deleted Content added
Stheotok (talk | contribs)
No edit summary
Stheotok (talk | contribs)
No edit summary
Line 306: Line 306:
| 1D
| 1D
|}
|}


==Egg timer==
* On July 4th there were 20.5 days of work left.




Line 313: Line 317:
* June 10th 2008: Completion of additional composite experiment with uniformly sampled data on undergrads. This will be used for the thesis, or for future Ptrim paper versions.
* June 10th 2008: Completion of additional composite experiment with uniformly sampled data on undergrads. This will be used for the thesis, or for future Ptrim paper versions.
* September 2008: Expected revision of Ptrim journal paper.
* September 2008: Expected revision of Ptrim journal paper.
* July 10th 2008: First draft of thesis for overview with dds.
* July 30th 2008: First draft of thesis for overview with dds.
* August 25th 2008: Second draft of thesis for overview with dds.
* August 25th 2008: Second draft of thesis for overview with dds.
* September 20th 2008: Thesis version ready for review with dds.
* September 20th 2008: Thesis version ready for review with dds.

Revision as of 19:02, 4 July 2008

Publications Plan

  • Currently I only focus on thesis write-up. There are no specific goals for other publications.

Non-thesis-related personal plans

  • Follow SENSE/PENED accounting stuff.
  • Follow SOPRANO accounting stuff.
  • Follow DIEPTELO accounting stuff.

PhD thesis table of contents

No Section Comments Status Target
1. Introduction ...
1.1. Overview of my research and motivation Use Ptrim S1 Needs editing and writing 0.5D
1.2. Main results and original contributions ... Needs writing 0.5D
1.3. Organisation of thesis ... Needs writing 0.3D
2. Theory and background ...
2.1. Introduction – big picture ... Needs writing 0.3D
2.2. P2P networks and architectures Based on ACM survey Almost ready, need some formatting 0.2D
2.3. Transaction processing systems
2.3.1 Online Transaction processing systems Compared to centralized, characteristics, requirements (use e-commerce paper) Almost ready, need some formatting 0.2D
2.3.2 Definitions and requirements analysis Almost ready, need some formatting 0.2D
2.4. Centralized and distributed reputation management Survey of current approaches
2.4.1. Social behaviour and incentives Almost ready, need some formatting 0.5D
2.4.2. Trust and reputation Almost ready, need some formatting 0.5D
2.4.3. Reputation management Almost ready, need some formatting 0.2D
2.4.4. Distributed reputation management Almost ready, need some formatting 0.2D
2.4.5. The MoR-Trust system Needs editing 0.3D
2.5. Market-based risk management Financial derivatives, risk management, market efficiency. Use Ptrim S2.1. S2.4 Needs editing 0.3D
2.6. Auxiliary theory and tools used in this research Mention, with references to Sections, we’ll be talking about crawling utilities, importance sampling, Java/jxta development etc. Needs writing 0.3D
3. Problem definition and proposed solution ...
3.1. Definition of problem we want to attack: Managing P2P transaction risk Includes general and also specific goals Needs writing 0.5D
3.2. Limits of research scope Things that are not our problem ( References to Section 7). Needs writing 0.5D
3.3. Proposed solution: A Market based approach At an abstract level. Use patent literature for ideas.
3.3.1. Relation to other approaches Complementary to reputation management, explain how the two could cooperate. Needs writing 0.5D
3.3.2. Abstract description of proposed solution. Abstract design and architecture. Description of the market-based insurance layer, and the Ptrim system. Use Ptrim S2.3. Talk about need for efficient, competitive market. Use Ptrim S3.1. Needs editing and writing 0.5D
4. Methodology ...
4.1. Description of our overall approach We’ll build a prototype and test it, and we’ll also run composite experiments and evaluate the results. Needs editing and writing 0.5D
4.2. Hypotheses What were our specific hypotheses (H1, H2, H3). We’ll refer to them in d and e below, and also again in Section 6. Needs writing 1D
4.3. Prototype system trials What sort of trials we ran with the prototype. Use Ptrim S4.1. Which hypotheses do we address here.
4.3.1. Experimental setup How the experiment will work, software tool, subjects, questionnaires etc. Needs editing and writing 0.5D
4.3.2. Methodology for evaluation How will we evaluate the results. Needs editing and writing 0.5D
4.4. Composite experimental trials Use Ptrim S4.2. Which hypotheses do we address here.
4.4.1. Experimental setup How the experiment will work, software tool, subjects, questionnaires etc. Use Ptrim S Needs editing and writing 1D
4.4.2. Methodology for evaluation How will we evaluate the results (market efficiency, risk reduction, questionnaires etc) Needs editing and writing 1D
5. Design and implementation Follows the structure of 3c, but not at an abstract level any more, we refer to design and implementation. Lots of UML diagrams
5.1. Design of Ptrim system ... Needs editing and writing 1D
5.2. Ptrim implementation details How we implemented this: Java, jxta, messaging, etc Use Ptrim S3.2. Needs editing and writing 1D
5.3. Composite experiment setup
5.3.1 Implementation How we implemented this: Perl/CGI/MySQL etc. Needs editing and writing 1D
5.3.2. Data crawling How we did this Needs editing 0.5D
6. Results, evaluation and discussion ...
6.1. Evaluation of prototype trial outcomes Use Ptrim S5.1. Refer to hypotheses Needs editing and writing 0.5D
6.2. Evaluation of composite trial outcomes Use Ptrim S5.2. Refer to hypotheses Needs editing and writing 2D
6.3. Discussion of overall findings and implications for our approach ... Needs writing 0.5D
7. Future work Mention these also in Section 3.b.
7.1. Security ... Needs editing 0.5D
7.2. Collusion detection ... Needs editing 0.5D
7.3. Insuring insurance transactions ... Needs editing 0.5D
7.4. Further experiments and simulation studies ... Needs editing 0.5D
8. Conclusions and synopsis ... Needs writing 1D


Egg timer

  • On July 4th there were 20.5 days of work left.


PhD thesis research plan

  • May 29th 2008: Draft version of PhD skeleton, official initiation of writeup
  • June 10th 2008: Completion of additional composite experiment with uniformly sampled data on undergrads. This will be used for the thesis, or for future Ptrim paper versions.
  • September 2008: Expected revision of Ptrim journal paper.
  • July 30th 2008: First draft of thesis for overview with dds.
  • August 25th 2008: Second draft of thesis for overview with dds.
  • September 20th 2008: Thesis version ready for review with dds.
  • October 15th 2008: Final thesis version ready for submission.
  • November 2008: Thesis presentation and PhD completion.