Kostas Stroggylos PhD research plan: Difference between revisions

From Istlab
Jump to navigationJump to search
Content deleted Content added
Circular (talk | contribs)
No edit summary
Circular (talk | contribs)
No edit summary
Line 1: Line 1:
Following the research proposal, the research plan outline is as follows:
Following the research proposal, the research plan outline is as follows:


* Aug 08: Complete the UmlDiff implementation (JDevAn port/optimization) for refactoring detection
* Mar 08: Complete the data / metric collection infrastructure, probably publish something based on that experience
* Jun 08: Perform tests with the search-based and the JDevan port for detecting refactorings
* Sep 08: Perform tests with the search-based and the UmlDiff-based method for detecting refactorings
* Sep 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
* Dec 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
* Dec 08: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
* Feb 09: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
* Mar 09: Start writing final thesis
* Apr 09: Start writing final thesis


More detailed plan to follow.
More detailed plan to follow.

Revision as of 00:46, 11 June 2008

Following the research proposal, the research plan outline is as follows:

  • Aug 08: Complete the UmlDiff implementation (JDevAn port/optimization) for refactoring detection
  • Sep 08: Perform tests with the search-based and the UmlDiff-based method for detecting refactorings
  • Dec 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
  • Feb 09: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
  • Apr 09: Start writing final thesis

More detailed plan to follow.