Kostas Stroggylos PhD research plan: Difference between revisions
From Istlab
Jump to navigationJump to search
Content deleted Content added
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
Following the research proposal, the research plan outline is as follows: |
Following the research proposal, the research plan outline is as follows: |
||
* Aug 08: Complete the UmlDiff implementation (JDevAn port/optimization) for refactoring detection |
|||
* Mar 08: Complete the data / metric collection infrastructure, probably publish something based on that experience |
|||
* |
* Sep 08: Perform tests with the search-based and the UmlDiff-based method for detecting refactorings |
||
* |
* Dec 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results |
||
* |
* Feb 09: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds |
||
* |
* Apr 09: Start writing final thesis |
||
More detailed plan to follow. |
More detailed plan to follow. |
||
Revision as of 00:46, 11 June 2008
Following the research proposal, the research plan outline is as follows:
- Aug 08: Complete the UmlDiff implementation (JDevAn port/optimization) for refactoring detection
- Sep 08: Perform tests with the search-based and the UmlDiff-based method for detecting refactorings
- Dec 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
- Feb 09: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
- Apr 09: Start writing final thesis
More detailed plan to follow.