Kostas Stroggylos PhD research plan: Difference between revisions
From Istlab
Jump to navigationJump to search
Content deleted Content added
No edit summary |
No edit summary |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
Following the research proposal, the research plan outline is as follows: |
Following the research proposal, the research plan outline is as follows: |
||
* Sep 15 08: Complete the refactoring detection engines (Lucene-based and RefactoringCrawler) |
|||
* Mar 08: Complete the data / metric collection infrastructure, probably publish something based on that experience |
|||
* Oct 01 08: Complete data collection |
|||
* Jun 08: Perform tests with the search-based and the JDevan port for detecting refactorings |
|||
* Oct 17 08: CSMR 09 Abstract |
|||
* Sep 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results |
|||
* Oct 24 08: CSMR 09 Paper, start again work on function metrics & bugs |
|||
* Dec 08: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds |
|||
* Dec 12 08: ICSE 09 doctoral symposium paper deadline |
|||
| ⚫ | |||
* Jan 09: Model refinement, optimization |
|||
| ⚫ | |||
* Jul 09: Complete thesis |
|||
More detailed plan to follow. |
More detailed plan to follow. |
||
[[Category:SENSE]] |
|||
Latest revision as of 11:21, 26 August 2008
Following the research proposal, the research plan outline is as follows:
- Sep 15 08: Complete the refactoring detection engines (Lucene-based and RefactoringCrawler)
- Oct 01 08: Complete data collection
- Oct 17 08: CSMR 09 Abstract
- Oct 24 08: CSMR 09 Paper, start again work on function metrics & bugs
- Dec 12 08: ICSE 09 doctoral symposium paper deadline
- Jan 09: Model refinement, optimization
- Apr 09: Start writing final thesis
- Jul 09: Complete thesis
More detailed plan to follow.