Giorgos Gousios PhD research plan: Difference between revisions

From Istlab
Jump to navigationJump to search
Content deleted Content added
Giorgos PhD planning
 
No edit summary
 
Line 1: Line 1:
A draft version of my PhD plan. More details to be added soon

*June/07: Port of JikesRVM on Xen boots and execs HelloWorld. Maybe write paper outlining the experience
*June/07: Port of JikesRVM on Xen boots and execs HelloWorld. Maybe write paper outlining the experience
*Sep/07: Start designing/writing a minimal resource management architecture required to support the classpath
*Sep/07: Start designing/writing a minimal resource management architecture required to support the classpath

Latest revision as of 17:27, 14 March 2007

A draft version of my PhD plan. More details to be added soon

  • June/07: Port of JikesRVM on Xen boots and execs HelloWorld. Maybe write paper outlining the experience
  • Sep/07: Start designing/writing a minimal resource management architecture required to support the classpath
  • Nov/07: Write paper describing the system, have it ready before Christmas since most conferences have deadlines immediately after.
  • Dec/07: OS infrastructure is finished, start porting the classpath.
  • Mar/08: The system is able to run Tomcat
  • Apr/08: (Hopefully) Start writing thesis
  • Nov/08: Thesis is finished! Start planning how to postpone joining the army :-)