Stephanos Androutsellis PhD research plan: Difference between revisions
From Istlab
Jump to navigationJump to search
Content deleted Content added
No edit summary |
No edit summary |
||
| (6 intermediate revisions by the same user not shown) | |||
| Line 6: | Line 6: | ||
* Follow SOPRANO accounting stuff. |
* Follow SOPRANO accounting stuff. |
||
* Follow DIEPTELO accounting stuff. |
* Follow DIEPTELO accounting stuff. |
||
* Prepare for SOPRANO Bilbao meeting (June 10-12). |
|||
==PhD thesis table of contents== |
==PhD thesis table of contents== |
||
See google docs... |
|||
{| border="1" |
|||
! No !! Section !! Comments !! Status !! Target |
|||
|- |
|||
! 1. |
|||
| Introduction |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 1.1. |
|||
| Overview of my research and motivation |
|||
| Use Ptrim S1 |
|||
| |
|||
| |
|||
|- |
|||
! 1.2. |
|||
| Main results and original contributions |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 1.3. |
|||
| Organisation of thesis |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 2. |
|||
| Theory and background |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 2.1. |
|||
| Introduction – big picture |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 2.2. |
|||
| P2P networks and architectures |
|||
| Based on ACM survey |
|||
| Almost ready, need some formatting |
|||
| 1D |
|||
|- |
|||
! 2.3. |
|||
| Transaction processing systems |
|||
| |
|||
| |
|||
| |
|||
|- |
|||
! 2.3.1 |
|||
| Online Transaction processing systems |
|||
| Compared to centralized, characteristics, requirements (use e-commerce paper) |
|||
| Almost ready, need some formatting |
|||
| 1D |
|||
|- |
|||
! 2.3.2 |
|||
| Definitions and requirements analysis |
|||
| |
|||
| Almost ready, need some formatting |
|||
| 1D |
|||
|- |
|||
! 2.4. |
|||
| Centralized and distributed reputation management |
|||
| Survey of current approaches |
|||
| |
|||
| |
|||
|- |
|||
! 2.4.1. |
|||
| Social behaviour and incentives |
|||
| |
|||
| Almost ready, need some formatting |
|||
| 1D |
|||
|- |
|||
! 2.4.2. |
|||
| Trust and reputation |
|||
| |
|||
| Almost ready, need some formatting |
|||
| 1D |
|||
|- |
|||
! 2.4.3. |
|||
| Reputation management |
|||
| |
|||
| Almost ready, need some formatting |
|||
| 1D |
|||
|- |
|||
! 2.4.4. |
|||
| Distributed reputation management |
|||
| |
|||
| Almost ready, need some formatting |
|||
| 1D |
|||
|- |
|||
! 2.4.5. |
|||
| The MoR-Trust system |
|||
| |
|||
| |
|||
| |
|||
|- |
|||
! 2.5. |
|||
| Market-based risk management |
|||
| Financial derivatives, risk management, market efficiency. Use Ptrim S2.1. S2.4 |
|||
| |
|||
| |
|||
|- |
|||
! 2.6. |
|||
| Auxiliary theory and tools used in this research |
|||
| Mention, with references to Sections, we’ll be talking about crawling utilities, importance sampling, Java/jxta development etc. |
|||
| |
|||
| |
|||
|- |
|||
! 3. |
|||
| Problem definition and proposed solution |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 3.1. |
|||
| Definition of problem we want to attack: Managing P2P transaction risk |
|||
| Includes general and also specific goals |
|||
| |
|||
| |
|||
|- |
|||
! 3.2. |
|||
| Limits of research scope |
|||
| Things that are not our problem ( References to Section 7). |
|||
| |
|||
| |
|||
|- |
|||
! 3.3. |
|||
| Proposed solution: A Market based approach |
|||
| At an abstract level. Use patent literature for ideas. |
|||
| |
|||
| |
|||
|- |
|||
! 3.3.1. |
|||
| Relation to other approaches |
|||
| Complementary to reputation management, explain how the two could cooperate. |
|||
| |
|||
| |
|||
|- |
|||
! 3.3.2. |
|||
| Abstract description of proposed solution. |
|||
| Abstract design and architecture. Description of the market-based insurance layer, and the Ptrim system. Use Ptrim S2.3. Talk about need for efficient, competitive market. Use Ptrim S3.1. |
|||
| |
|||
| |
|||
|- |
|||
! 4. |
|||
| Methodology |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 4.1. |
|||
| Description of our overall approach |
|||
| We’ll build a prototype and test it, and we’ll also run composite experiments and evaluate the results. |
|||
| |
|||
| |
|||
|- |
|||
! 4.2. |
|||
| Hypotheses |
|||
| What were our specific hypotheses (H1, H2, H3). We’ll refer to them in d and e below, and also again in Section 6. |
|||
| |
|||
| |
|||
|- |
|||
! 4.3. |
|||
| Prototype system trials |
|||
| What sort of trials we ran with the prototype. Use Ptrim S4.1. Which hypotheses do we address here. |
|||
| |
|||
| |
|||
|- |
|||
! 4.3.1. |
|||
| Experimental setup |
|||
| How the experiment will work, software tool, subjects, questionnaires etc. |
|||
| |
|||
| |
|||
|- |
|||
! 4.3.2. |
|||
| Methodology for evaluation |
|||
| How will we evaluate the results. |
|||
| |
|||
| |
|||
|- |
|||
! 4.4. |
|||
| Composite experimental trials |
|||
| Use Ptrim S4.2. Which hypotheses do we address here. |
|||
| |
|||
| |
|||
|- |
|||
! 4.4.1. |
|||
| Experimental setup |
|||
| How the experiment will work, software tool, subjects, questionnaires etc. Use Ptrim S |
|||
| |
|||
| |
|||
|- |
|||
! 4.4.2. |
|||
| Methodology for evaluation |
|||
| How will we evaluate the results (market efficiency, risk reduction, questionnaires etc) |
|||
| |
|||
| |
|||
|- |
|||
! 5. |
|||
| Design and implementation |
|||
| Follows the structure of 3c, but not at an abstract level any more, we refer to design and implementation. Lots of UML diagrams |
|||
| |
|||
| |
|||
|- |
|||
! 5.1. |
|||
| Design of Ptrim system |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 5.2. |
|||
| Ptrim implementation details |
|||
| How we implemented this: Java, jxta, messaging, etc Use Ptrim S3.2. |
|||
| |
|||
| |
|||
|- |
|||
! 5.3. |
|||
| Composite experiment setup |
|||
| |
|||
| |
|||
| |
|||
|- |
|||
! 5.3.1 |
|||
| Implementation |
|||
| How we implemented this: Perl/CGI/MySQL etc. |
|||
| |
|||
| |
|||
|- |
|||
! 5.3.2. |
|||
| Data crawling |
|||
| How we did this |
|||
| |
|||
| |
|||
|- |
|||
! 6. |
|||
| Results, evaluation and discussion |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 6.1. |
|||
| Evaluation of prototype trial outcomes |
|||
| Use Ptrim S5.1. Refer to hypotheses |
|||
| |
|||
| |
|||
|- |
|||
! 6.2. |
|||
| Evaluation of composite trial outcomes |
|||
| Use Ptrim S5.2. Refer to hypotheses |
|||
| |
|||
| |
|||
|- |
|||
! 6.3. |
|||
| Discussion of overall findings and implications for our approach |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 7. |
|||
| Future work |
|||
| Mention these also in Section 3.b. |
|||
| |
|||
| |
|||
|- |
|||
! 7.1. |
|||
| Security |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 7.2. |
|||
| Collusion detection |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 7.3. |
|||
| Insuring insurance transactions |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 7.4. |
|||
| Further experiments and simulation studies |
|||
| ... |
|||
| |
|||
| |
|||
|- |
|||
! 8. |
|||
| Conclusions and synopsis |
|||
| ... |
|||
| |
|||
| |
|||
|} |
|||
==PhD thesis research plan== |
==PhD thesis research plan== |
||
* Sept 7th 2008: Chapter 3 draft ready. |
|||
* May 29th 2008: Draft version of PhD skeleton, official initiation of writeup |
|||
* Sept 14th 2008: Chapter 4 draft ready. |
|||
* June 10th 2008: Completion of additional composite experiment with uniformly sampled data on undergrads. This will be used for the thesis, or for future Ptrim paper versions. |
|||
* September 2008: Expected revision of Ptrim journal paper. |
* September 2008: Expected revision of Ptrim journal paper. |
||
* |
* October 31st 2008: Entire thesis draft ready for review by dds. |
||
* |
* November 31st 2008: Final thesis version ready for submission. |
||
* |
* December 2008: Thesis presentation and PhD completion. |
||
* October 15th 2008: Final thesis version ready for submission. |
|||
* November 2008: Thesis presentation and PhD completion. |
|||
Latest revision as of 08:02, 27 August 2008
Publications Plan
- Currently I only focus on thesis write-up. There are no specific goals for other publications.
- Follow SENSE/PENED accounting stuff.
- Follow SOPRANO accounting stuff.
- Follow DIEPTELO accounting stuff.
PhD thesis table of contents
See google docs...
PhD thesis research plan
- Sept 7th 2008: Chapter 3 draft ready.
- Sept 14th 2008: Chapter 4 draft ready.
- September 2008: Expected revision of Ptrim journal paper.
- October 31st 2008: Entire thesis draft ready for review by dds.
- November 31st 2008: Final thesis version ready for submission.
- December 2008: Thesis presentation and PhD completion.