Kostas Stroggylos PhD research plan: Difference between revisions

From Istlab
Jump to navigationJump to search
Content deleted Content added
Circular (talk | contribs)
No edit summary
Circular (talk | contribs)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Following the research proposal, the research plan outline is as follows:
Following the research proposal, the research plan outline is as follows:


* Aug 08: Complete the UmlDiff implementation (JDevAn port/optimization) for refactoring detection
* Sep 15 08: Complete the refactoring detection engines (Lucene-based and RefactoringCrawler)
* Oct 01 08: Complete data collection
* Sep 08: Perform tests with the search-based and the UmlDiff-based method for detecting refactorings
* Oct 17 08: CSMR 09 Abstract
* Dec 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
* Oct 24 08: CSMR 09 Paper, start again work on function metrics & bugs
* Feb 09: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
* Dec 12 08: ICSE 09 doctoral symposium paper deadline
* Jan 09: Model refinement, optimization
* Apr 09: Start writing final thesis
* Apr 09: Start writing final thesis
* Jul 09: Complete thesis


More detailed plan to follow.
More detailed plan to follow.

[[Category:SENSE]]

Latest revision as of 11:21, 26 August 2008

Following the research proposal, the research plan outline is as follows:

  • Sep 15 08: Complete the refactoring detection engines (Lucene-based and RefactoringCrawler)
  • Oct 01 08: Complete data collection
  • Oct 17 08: CSMR 09 Abstract
  • Oct 24 08: CSMR 09 Paper, start again work on function metrics & bugs
  • Dec 12 08: ICSE 09 doctoral symposium paper deadline
  • Jan 09: Model refinement, optimization
  • Apr 09: Start writing final thesis
  • Jul 09: Complete thesis

More detailed plan to follow.