Kostas Stroggylos PhD research plan: Difference between revisions

From Istlab
Jump to navigationJump to search
Content deleted Content added
No edit summary
 
Circular (talk | contribs)
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
Following the research proposal, the research plan outline is as follows:
Following the research proposal, the research plan outline is as follows:


* Sep 15 08: Complete the refactoring detection engines (Lucene-based and RefactoringCrawler)
* Sep 07: Build a data / metric infrastructure (first version: May 07), probably publish something based on that experience
* Oct 01 08: Complete data collection
* Mar 08: Perform comparative analysis of refactoring usage on commercial and OSS projects (requires collaboration with software vendors), report results
* Oct 17 08: CSMR 09 Abstract
* Sep 07: Perform comparative analysis of OSS and commercial software projects regarding software quality and process metrics, report results
* Oct 24 08: CSMR 09 Paper, start again work on function metrics & bugs
* Mar 08: Validation of the above results, and the 'refactor to make adding new functionality easy' pattern in both worlds
* Dec 12 08: ICSE 09 doctoral symposium paper deadline
⚫
* Sep 08: Start writing final thesis
* Jan 09: Model refinement, optimization
⚫
* Apr 09: Start writing final thesis
* Jul 09: Complete thesis


More detailed plan to follow.
More detailed plan to follow.

[[Category:SENSE]]

Latest revision as of 11:21, 26 August 2008

Following the research proposal, the research plan outline is as follows:

  • Sep 15 08: Complete the refactoring detection engines (Lucene-based and RefactoringCrawler)
  • Oct 01 08: Complete data collection
  • Oct 17 08: CSMR 09 Abstract
  • Oct 24 08: CSMR 09 Paper, start again work on function metrics & bugs
  • Dec 12 08: ICSE 09 doctoral symposium paper deadline
  • Jan 09: Model refinement, optimization
  • Apr 09: Start writing final thesis
  • Jul 09: Complete thesis

More detailed plan to follow.