Giorgos Gousios PhD research plan: Difference between revisions
From Istlab
Jump to navigationJump to search
Content deleted Content added
Giorgos PhD planning |
No edit summary |
||
| Line 1: | Line 1: | ||
A draft version of my PhD plan. More details to be added soon |
|||
*June/07: Port of JikesRVM on Xen boots and execs HelloWorld. Maybe write paper outlining the experience |
*June/07: Port of JikesRVM on Xen boots and execs HelloWorld. Maybe write paper outlining the experience |
||
*Sep/07: Start designing/writing a minimal resource management architecture required to support the classpath |
*Sep/07: Start designing/writing a minimal resource management architecture required to support the classpath |
||
Latest revision as of 17:27, 14 March 2007
A draft version of my PhD plan. More details to be added soon
- June/07: Port of JikesRVM on Xen boots and execs HelloWorld. Maybe write paper outlining the experience
- Sep/07: Start designing/writing a minimal resource management architecture required to support the classpath
- Nov/07: Write paper describing the system, have it ready before Christmas since most conferences have deadlines immediately after.
- Dec/07: OS infrastructure is finished, start porting the classpath.
- Mar/08: The system is able to run Tomcat
- Apr/08: (Hopefully) Start writing thesis
- Nov/08: Thesis is finished! Start planning how to postpone joining the army :-)